Tuesday, July 5, 2011
oof! long day.. 6 hours on re-writing codes to check calibration. started working on completeness for final check.. though spending time on previously worked results is not good, stefano also suggests that it is better to ensure the results before finalizing things. Will do skype chat with stefano tomorrow (wednesday) and arjen.
Thursday, June 30, 2011
had quite a short work day due to imprs seminar and imprs evening.
I communicated with stefano through couple of emails regarding some questions..
one hour spent on writing up detector settings.
then started working on the stellar locus problem. Aim is to understand the locus of the stellar sources in j-k. Also, I need to check firmly the colors and with musyc since this part. so, I will do a quick revision of this checks again completely ( a quick re-do of work to confirm my plots) for Stefano.
Finish before monday or burst!!!!
I communicated with stefano through couple of emails regarding some questions..
one hour spent on writing up detector settings.
then started working on the stellar locus problem. Aim is to understand the locus of the stellar sources in j-k. Also, I need to check firmly the colors and with musyc since this part. so, I will do a quick revision of this checks again completely ( a quick re-do of work to confirm my plots) for Stefano.
Finish before monday or burst!!!!
Monday, June 27, 2011
Aim: to complete the data section
details: image quality and its variations, source detections (size/stellarity), flux calibrations precision, image depth with 5sigma limits
work done today: few hours for information collection on the above topics. still some questions remains for which i am contacting stefano. Remaining time today has been spent on writing the above information into the draft.
details: image quality and its variations, source detections (size/stellarity), flux calibrations precision, image depth with 5sigma limits
work done today: few hours for information collection on the above topics. still some questions remains for which i am contacting stefano. Remaining time today has been spent on writing the above information into the draft.
Monday, June 20, 2011
Wednesday, June 15, 2011
Tuesday, June 14, 2011
Started working at 10.30am today.
Had spent first 1 hour reading updates/ Astroph /news.
Starting working on my report. spent around 3 hours writing couple of paragraphs on J-K color plots.
--left home at 17.30
-- started working again at 21.00
4 hours on writing construction of synthetic magnitudes, why used, alternatives, equations.
few hours checking plots on synthetic magnitudes. I am planning to include color normalized by error plot in the paper. So tomorrow, I got to use some time shaping this plot in journal format including overplotting for multiple bins.
Also, I am planning to write remaining part of the paper which is validating total fluxes. I need to check first whether this is required from the Auto-Aper plot and If so, the method for validation (as given in Taylor et al)
Had spent first 1 hour reading updates/ Astroph /news.
Starting working on my report. spent around 3 hours writing couple of paragraphs on J-K color plots.
--left home at 17.30
-- started working again at 21.00
4 hours on writing construction of synthetic magnitudes, why used, alternatives, equations.
few hours checking plots on synthetic magnitudes. I am planning to include color normalized by error plot in the paper. So tomorrow, I got to use some time shaping this plot in journal format including overplotting for multiple bins.
Also, I am planning to write remaining part of the paper which is validating total fluxes. I need to check first whether this is required from the Auto-Aper plot and If so, the method for validation (as given in Taylor et al)
Wednesday, June 8, 2011
Started working after couple of days of bad health. Today I worked on the draft section, which I am still clinging on too :( (slow as usual )
I had to work on few sections before I conclude this in the paper. The sections, as mentioned by Stefano and HW, are
1. Compare Euclids/2mass J-K color locus of stars and check the stellar sequence in the J-K HAWKI color, as well as the calibration of J-K stars.
2. For a large galaxy, compare with Auto magnitude of SEx and a large APER. Plot the distribution of Auto mag - Aper Mag.
Will give the update about all the three above process tomorrow. I started my work today at 10.30 and worked will 4.30 when one of the indian colleague dislocated his shoulder bone while playing football at the institute and I had to take him to the hospital. I am trying to resume work now for couple of hours.
I had to work on few sections before I conclude this in the paper. The sections, as mentioned by Stefano and HW, are
1. Compare Euclids/2mass J-K color locus of stars and check the stellar sequence in the J-K HAWKI color, as well as the calibration of J-K stars.
2. For a large galaxy, compare with Auto magnitude of SEx and a large APER. Plot the distribution of Auto mag - Aper Mag.
Will give the update about all the three above process tomorrow. I started my work today at 10.30 and worked will 4.30 when one of the indian colleague dislocated his shoulder bone while playing football at the institute and I had to take him to the hospital. I am trying to resume work now for couple of hours.
Thursday, June 2, 2011
Monday, March 7, 2011
Tuesday, March 1, 2011
Friday, February 25, 2011
Thursday, February 24, 2011
Trying to spot which are the objects in the K mosaic that can be used to get the PSF.. Its quite hard to differentiate between a star and an elliptical galaxy since no object is perfectly circular in the image.. am using IDL to get the PSF parameters.. cross checking with IRAF.. hope to produce the PSF for about 20 objects soon..
Hi
Dear HW and Stefano, I hope this would be a good place to discuss some online science and track down my order of working.. since Stefano is far away and it is easy if he is able follow me by some means.. I would prefer something even easier than this blog.. something like twitter but there you have to sign up and hence may be this is lot direct.. If you have any other blog site in mind, pls let me know and I will shift.. i know some softwares which are used in corporates to communicate between the groups, a common platform kinda thing.. but may be it is too much of work to install etc.. so i will try to update this site with the topics i am working on and things i am stuck with.. if i forget to update,. pls give a tap on the head and i will wake up!
Subscribe to:
Comments (Atom)